Benutzer-Werkzeuge

Webseiten-Werkzeuge


mk3:switch

Dies ist eine alte Version des Dokuments!


Battery Switch

The Battery Switch is accessible via the Sidebar → Battery Switch.
It allows controlled activation and deactivation of the entire battery system.

Battery Switch UI

System Start-Up

After booting, the BMS requires about 120 seconds for full initialization.
Only after this delay the green „Power On“ button becomes available.

⏳ During this time, the system runs internal checks and communication initialization.

Activation Flow

High Voltage Systems

When „Power On“ is pressed, the BMS automatically performs an isolation test

If the test passes, the precharge sequence starts, followed by activation of the positive and negative relays

The system is now live and ready for operation

Low Voltage Systems

Same flow as above, but without isolation test

Relays are closed after a short delay and the inverter is powered up


When System is Active

Once relays are engaged, two buttons become visible:

🔴 Emergency Stop
Instantly disables all relays – use only in emergency situations ⚠️ Cuts power without any shutdown process. May lead to system faults if used during operation.

🔵 Shutdown
Recommended method for turning the system off Sends a clean shutdown signal to the inverter and safely disconnects all relays afterward


Status Indicators

State:
Shows current switch/test state (e.g. Waiting, Testing Isolation, Ready, Error)

Relays:
Displays relay status (e.g. Open, Closed, Precharge, Error) 🔍 Always check both values before powering on or off the system manually.

mk3/switch.1744050504.txt.gz · Zuletzt geändert: 2025/04/07 18:28 von grnbms_tech