Dies ist eine alte Version des Dokuments!
Inhaltsverzeichnis
Battery Switch
The Battery Switch is accessible via the Sidebar → Battery Switch.
It allows controlled activation and deactivation of the entire battery system.
System Start-Up
After booting, the BMS requires about 120 seconds for full initialization.
Only after this delay the green „Power On“ button becomes available.
⏳ During this time, the system runs internal checks and communication initialization.
Activation Flow
High Voltage Systems
When „Power On“ is pressed, the BMS automatically performs an isolation test
If the test passes, the precharge sequence starts, followed by activation of the positive and negative relays
The system is now live and ready for operation
Low Voltage Systems
Same flow as above, but without isolation test
Relays are closed after a short delay and the inverter is powered up
When System is Active
Once relays are engaged, two buttons become visible:
🔴 Emergency Stop
Instantly disables all relays – use only in emergency situations ⚠️ Cuts power without any shutdown process. May lead to system faults if used during operation.
🔵 Shutdown
Recommended method for turning the system off Sends a clean shutdown signal to the inverter and safely disconnects all relays afterward
Status Indicators
State:
Shows current switch/test state (e.g. Waiting, Testing Isolation, Ready, Error)
Relays:
Displays relay status (e.g. Open, Closed, Precharge, Error)
🔍 Always check both values before powering on or off the system manually.
