==== High Voltage Relay Wiring – with Precharge ==== ⚠️ **Disclaimer – Safety First!** \\ The wiring diagrams and connection examples provided here are **suggestions only** and may not cover all edge cases or safety requirements.\\ All high-voltage components must be installed and verified by a **qualified electrician** or professional installer.\\ Incorrect wiring or misuse can lead to **severe damage, fire, or personal injury**.\\ The manufacturer assumes **no liability** for damages resulting from improper installation or handling. Below is the recommended HV wiring setup for systems using **3 relays** and **precharge functionality**: {{:mk3:screenshot_2025-04-07_170957.png?740x358}} === 🧩 Components: === * **HV Battery:** Provides the main power * **HV Fuse:** Protects the system from overcurrent * **HV Relays (3 total):** * **Precharge Relay:** Connects via precharge resistor to slowly charge input capacitors * **Positive Relay:** Main high-side connection to the load * **Negative Relay:** Switches the low side (Battery -) * **Precharge Resistor:** Limits inrush current when first connecting to the inverter * **Current Shunt:** Measures total current flow * **Inverter / Load:** Final consumer of the HV power * **Chassis connection (''E'' pin):** Must be connected to battery chassis – ideally with 2 separate wires === 🔌 BMS HV Connector Pins: === * **B+ / B-:** Connect directly to the battery * **O+ / O-:** Connected after the relays, represents the //output side// * **E:** Earth/Chassis connection ''⚠️ Important: The **precharge path** must always lead through the shunt to ensure current measurement during precharge. The **positive and negative relays** must remain **open** during precharge phase and close only after precharge completes.'' 👉 This wiring ensures proper current monitoring and safe soft-start of the system. ==== Relay Control ==== The GRNbms MK3 directly controls all three HV relays using integrated 12 V outputs.\\ Each relay is connected via its **dedicated connector**: * **HV Relay Positive** * **HV Relay Negative** * **HV Relay Precharge** === Requirements: === * Relays must have a **12 V coil** * **No external power supply** is needed – the BMS provides the 12 V directly * Each output is internally protected and current-limited 👉 We recommend using relays with economizer to avoid unnecessary load on the BMS power supply ''✅ Just plug in your relays – the BMS handles power and timing automatically''